• Construction of home-service and trade complex with design works – Investment Świnoujście (as an order of PBG Sp. S.A.) Substantial range involves:
  • Complex construction-mounting works, internal installation branch in complex „I”,
  • Complex electric, teletechnical and AKPiA branch works in complex „I”,
  • Complex building-construction works in complex „G”
  • Complex finishing works in building „G”,
  • Complex finishing of elevation, balustrades, roofs, insulation, area development in building „G”,
  • Construction of a home and service complex „E”.
  • Adaptation of barracks for home and cultural-education buildings in Grudziądz
  • Construction of water and sewage network for Włocławek – Michelin.
  • Construction of water and sewage network for the right-bank part of Szczecin.
  • Modernisation of the Left Bank Waste Water Treatment Plant at Serbskiej Street in Poznań, range of task: storage reservoirs.
  • Adaptation of a building of the „students’ canteen”, Rocha Street in Poznań for a Sports and Recreation Centre.
  • Construction of a detached house with a garage dedicated for an office in Włocławek.
  • Rebuilding of the S – 3 road Klucz – Pyrzyce as an order of Hermann Kirchner Polska Sp. z o.o. The range of works involves: rebuilding and construction of water, sewage and pressure network; road corpus dehydration, steel culverts construction, rain drainage, storage evaporation and filtration reservoirs construction and rebuilding of meliorative devices.
  • Rebuilding of the S-3 road Pyrzyce – Myślibórz as an order of Budimex Dromex company ng exploitation costs by means of the use of electric and thermal energy from biogas and treatment of waste products coming from waste sorting plant – Rogoźno (Tomaszów Lubelski).